When Abergeldie were chosen to construct the $18m, 500m long Escarpment Boardwalk along the Parramatta River, they turned to Pacific Survey to provide the construction surveying expertise to help deliver the works. The boardwalk was constructed at river level and included 59 piles, 88 precast beams and 159 precast panels. A 130m long steel concrete pathway with stairs was also built to connect the boardwalk with Stewart Street. Work commenced in April 2020 and was completed in April 2021.