Brisbane Riverwalk Replacement

Projects

John Holland engaged Pacific Survey to manage and provide the survey for construction of the $79m replacement Brisbane Riverwalk Bridge. The 870m long structure is used for pedestrian and bike access around the foreshore of the Brisbane river and construction was completed in October 2014.

Previous

Stingray Creek Bridge

Next

Kerr Road Bridge