- Category
- Roads
- Location
- Woolgoolga to Ballina
- Mid North Coast & Northern Rivers
- NSW
- Client
- Transport for NSW
- Status
- Completed
Pacific Highway Upgrade, Woolgoolga to Ballina - W2B Section 5
Transport for NSW engaged Pacific Survey to provide a survey solution for the set out of 15km long duplication of the Pacific Highway Upgrade between Maclean and Iluka Road, known as Section 5.
The works in Section 5 comprise the following:
- Clearing, topsoil removal, foundation treatments and bulk earthworks for the mainline carriageways and local road embankments
- Transverse and longitudinal drainage infrastructure for mainline and local road including construction of pipe culverts and reinforced concrete box culverts
- Fauna crossings and furniture
- Foamed bitumen pavement for main line carriageway
- Finishing/Road Furniture works including verge placement, protection barriers, signage, line marking and street lighting
- Tie-in Works to bridges
- Three major interchanges at Yamba Road, Harwood (Watts Lane) and Iluka
- Road, together with upgrade of local roads. East Roundabout at Iluka Road
- Two minor interchanges at Chatsworth North & South